Kastura
Call

Custom cabinets in new-build districts

New build has straight walls, and still no standard cabinet fits: the children's room is 2.80 wide, the hallway 1.10, the attic has two slopes. We measure on handover day, when the keys are there, and install in the weeks after, so the boxes can go straight into the cabinet when you move. These are the districts where we do that most often.

  • Measured on handover day, installed before the move
  • Yes. We measure on the bare floor and account for the floor thickness; the plinth absorbs the last millimetres.
  • 21 days from approval to installed

Live elsewhere in South Holland? We work across The Hague, Rijswijk, Voorburg, Wassenaar, Delft, Zoetermeer, Leiden and Westland, and sometimes beyond.

Your price estimate in one minute

Four choices, an instant range. Then we call you to plan a measuring visit, if you want us to.

1. Which type of cabinet?
Where will it go?
3. Doors and finish
4. When do you want it?

Give us a call. Within five minutes you know what your cabinet costs.

The estimate above is a range, because we have not seen your wall yet. On the phone we ask three questions and then you get a price you can count on. No sales talk, no emails back and forth.

  • A price within five minutes instead of a range
  • Planning benefit of up to 250 euros if you are flexible on the installation day
  • A measuring appointment straight away, usually within three working days

Available on weekdays from 8:00 to 20:00 and Saturdays until 17:00.

That planning benefit is not a sales trick. If we are already working in your neighbourhood that week, it saves us travel time and half a day of setting up. We pass that saving on, up to 250 euros. Tell us on the phone that you are flexible with the date and we will see what fits the schedule.

Frequently asked questions

When should we involve you with new build?

As soon as you have a handover date. We measure on handover day and install in the weeks after, before you move.

Can you measure before the floor is in?

Yes. We measure on the bare floor and account for the floor thickness; the plinth absorbs the last millimetres.

May we drill into new-build walls?

Yes, outside the pipe zones. A built-in stands on the floor and is only fixed to the wall against tipping.

Estimate